OneGear™ Standard Plenum Assembly Procedure

5-7

7712-IN001B-EN-P – June 2013

At this point, the OneGear™ SMC plenum should be completely attached
to the switchgear equipment. Apply silicone to gaps or holes located at
bends and corners. Continue with installation of the OneGear™ plenum
components.

16. Temporarily attach the inner rear and front bracket (81021-715-51)

and top inner bracket (81021-716-51) using M8 hardware as shown in
Figure 5.9.

Figure 5.9 – Attaching top, front and rear inner bracket

17. Take front and rear plates of 7712/7719 plenum assembly, position

it as shown in Figure 5.10, and connect it OneGear top plate using
M8 hardware (M8 HHCS, 28 mm (1.125”) OD fl at washers and lock
washer).

Figure 5.10 – Starter plenum mounted on top of cabinet

18. Attach the outside bracket (81021-272-02) at the front and rear using

the M8 hardware (M8 HHCS, 19 mm (0.75”) OD fl at washers and lock
washer). Refer to Figure 5.11.