At the front of the enclosure on the fl oor, you will fi nd the bottom conduit

cover. There are four bolts holding the cover in place. Remove these four
bolts and remove cover.

Figure 4.14 – Bottom Conduit Cover

The starter should now be placed in its fi nal service location. It is important
to ensure the MV MCC lineup is in the proper position as the load cables
are to go through the bottom conduit cover. It is also important that the
fi nal installation location for the starter lineup is at a certain minimal distance
from obstructions (e.g. walls and support columns). Refer to Figures 4.16
and 4.17.

Remove four bolts

from conduit cover