5-2
OneGear™ Standard Plenum Assembly Procedure
7712-IN001B-EN-P – June 2013
3. Install the switchgear gas duct per manufacturer’s instructions
(e.g. ABB UniGear type ZS1 – Standard Gas Duct Assembling Procedure).
4. Locate the ABB connecting adapter plate (81023-965-51/52) for
connecting to the switchgear using M8 hardware (see Figure 5.2a).
Figure 5.2a – Attaching adapter plate to switchgear
5. Locate the front inner bracket (81021-958-51) for connecting to
switchgear temporarily using M8 hardware (see Figure 5.2b).
Figure 5.2b – Attaching front inner bracket
6. Apply gasket to the bottom fl ange of all front and rear assemblies (refer
to Figure 5.3).