Rockwell Automation 5370-CBPK Color CVIM BLISTER-PAK Option User Manual

Page 17

Advertising
background image

Chapter 3
Installing the BLISTER–PAK Option

3–2

Figure 3.1
Using the Installation RAM card

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

ЗЗЗ

CVIM Module

Card Label

Metal Strip

BLISTER-PAK
Installation Card

3. Apply power to the Color CVIM module to start the loading sequence.

!

ATTENTION: Do Not remove power to the Color CVIM
module during loading of the BLISTER-PAK option. Doing so
may damage the Color CVIM module.

During the loading process, the Pass/Fail LED alternates between orange
and green.

When the loading process is complete, the CVIM module begins its
normal powerup sequence.

4. Verify that the BLISTER-PAK option is installed by checking the title

banner on the monitor after powerup. If the BLISTER-PAK option is
correctly installed, a message (similar to the one illustrated in Figure 3.2
on page 3–3) will appear on the banner indicating the presence of the
BLISTER-PAK option.

Advertising