Ivoclar Vivadent IPS e.max CAD Labside User Manual
Page 37

C
u
t-
B
a
ck
Te
ch
n
iq
u
e
37
Firing parameters Crystallization/Glaze HT/LT
Please note:
– Crystallization/Glaze HT/LT can only be used for IPS e.max CAD HT and LT.
– If only max. two restorations are crystallized at the same time, the closing time S can be reduced to 1:30 min.
Furnace
P300
P500
P700
Stand-by
temperature
B
[°C/°F]
403/757
Closing time
S
[min]
6:00
Heating rate
t
1
[°C/°F/min]
90/162
Firing
temperature
T
1
[°C/°F]
820/1508
Holding time
H
1
[min]
0:10
Heating rate
t
2
[°C/°F/min]
30/54
Firing
temperature
T
2
[°C/°F]
840/1544
Holding time
H
2
[min]
7:00
Vacuum 1
1
1
[°C/°F]
1
2
[°C/°F]
550/820
1022/1508
Vacuum 2
2
1
[°C/°F]
2
2
[°C/°F]
820/840
1508/1540
Long-term
cooling
L
[°C/°F]
700/1292
Cooling rate
t
[°C/°F/min]
0
Note
Cooling after firing
– Remove IPS e.max CAD objects from the furnace after completion of the firing cycle (wait for the acoustic signal of the
furnace).
– Allow the objects to cool to room temperature in a place protected from draft.
– Do not touch the hot objects with metal tongs.
– Do not blast or quench the objects.