Configuration procedure, Verifying the configuration – H3C Technologies H3C S5560 Series Switches User Manual
Page 194
178
Figure 44 Network diagram
Configuration procedure
1.
Configure IP addresses and subnet masks for interfaces. (Details not shown.)
2.
Configure IS-IS on the switches to make sure Switch A, Switch B, and Switch C can communicate
with each other at layer 3 and dynamic route update can be implemented among them with IS-IS.
(Details not shown.)
3.
Enable IS-IS GR on Switch A.
<SwitchA> system-view
[SwitchA] isis 1
[SwitchA-isis-1] graceful-restart
[SwitchA-isis-1] return
Verifying the configuration
After Switch A establishes adjacencies with Switch B and Switch C, they begin to exchange routing
information.
# Restart the IS-IS process on Switch A.
<SwitchA> reset isis all 1 graceful-restart
Reset IS-IS process? [Y/N]:y
Switch A enters the restart state and sends connection requests to its neighbors through the GR
mechanism to synchronize the LSDB.
# Check the GR status of IS-IS on Switch A.
<SwitchA> display isis graceful-restart status
Restart information for IS-IS(1)
--------------------------------
Restart status: COMPLETE
Restart phase: Finish
Restart t1: 3, count 10; Restart t2: 60; Restart t3: 300
SA Bit: supported
Level-1 restart information
---------------------------
Total number of interfaces: 1
Number of waiting LSPs: 0
Level-2 restart information
---------------------------