Network requirements – H3C Technologies H3C S5560 Series Switches User Manual

Page 356

Advertising
background image

340

Summary Count : 2

Static Routing table Status : <Active>

Summary Count : 2

Destination: 1::/64 Protocol : Static

NextHop : 4::1 Preference: 60

Interface : Vlan-interface200 Cost : 0

Destination: 3::/64 Protocol : Static

NextHop : 5::1 Preference: 60

Interface : Vlan-interface300 Cost : 0

Static Routing table Status : <Inactive>

Summary Count : 0

# Use the ping command to test the reachability.

[SwitchA] ping ipv6 3::1

Ping6(104=40+8+56 bytes) 4::1 --> 3::1, press CTRL_C to break

56 bytes from 3::1, icmp_seq=0 hlim=62 time=0.700 ms

56 bytes from 3::1, icmp_seq=1 hlim=62 time=0.351 ms

56 bytes from 3::1, icmp_seq=2 hlim=62 time=0.338 ms

56 bytes from 3::1, icmp_seq=3 hlim=62 time=0.373 ms

56 bytes from 3::1, icmp_seq=4 hlim=62 time=0.316 ms

--- Ping6 statistics for 3::1 ---

5 packet(s) transmitted, 5 packet(s) received, 0.0% packet loss

round-trip min/avg/max/std-dev = 0.316/0.416/0.700/0.143 ms

BFD for IPv6 static routes configuration example (direct next

hop)

Network requirements

As shown in

Figure 83

:

Configure an IPv6 static route to subnet 120::/64 on Switch A.

Configure an IPv6 static route to subnet 121::/64 on Switch B.

Enable BFD for both routes.

Configure an IPv6 static route to subnet 120::/64 and an IPv6 static route to subnet 121::/64 on
Switch C.

When the link between Switch A and Switch B through the Layer 2 switch fails, BFD can detect the failure

immediately, and Switch A and Switch B can communicate through Switch C.

Advertising
This manual is related to the following products: