Protocol: ISIS Process ID: 1

SubProtID: 0x1 Age: 04h20m37s

Cost: 20 Preference: 10

Tag: 0 State: Active Adv

OrigTblID: 0x0 OrigVrf: default-vrf

TableID: 0x2 OrigAs: 0

NibID: 0x26000002 LastAs: 0

AttrID: 0xffffffff Neighbor: 0.0.0.0

Flags: 0x1008c OrigNextHop: 10.1.1.100

Label: NULL RealNextHop: 10.1.1.100

BkLabel: NULL BkNextHop: N/A

Tunnel ID: Invalid Interface: Vlan-interface11

BkTunnel ID: Invalid BkInterface: N/A

The output shows that Switch A and Switch B communicate through VLAN-interface 11.

IS-IS FRR configuration example

Network requirements

As shown in

Figure 47

, Switch A, Switch B, and Switch C belong to the same IS-IS routing domain.

Configure IS-IS FRR so that when the Link A fails, traffic can be switched to Link B immediately.

Figure 47 Network diagram

Device Interface

IP address

Device

Interface

IP address

Switch A

Vlan-int100

12.12.12.1/24

Switch B

Vlan-int101 24.24.24.4/24

Vlan-int200

13.13.13.1/24

Vlan-int200

13.13.13.2/24

Loop0

1.1.1.1/32

Loop0

4.4.4.4/32

Switch C

Vlan-int100

12.12.12.2/24

Vlan-int101

24.24.24.2/24

Configuration procedure

1.

Configure IP addresses and subnet masks for interfaces on the switches. (Details not shown.)

2.

Configure IS-IS on the switches to make sure Switch A, Switch B, and Switch C can communicate
with each other at Layer 3. (Details not shown.)

3.

Configure IS-IS FRR:
Enable IS-IS FRR to automatically calculate a backup next hop, or designate a backup next hop by
using a referenced routing policy.

{

(Method 1.) Enable IS-IS FRR to automatically calculate a backup next hop:
# Configure Switch A.