Bfd for is-is configuration example, Network requirements, Configuration procedure – H3C Technologies H3C S5560 Series Switches User Manual

Page 198

Advertising
background image

182

Flags: D-Direct, R-Added to Rib, L-Advertised in LSPs, U-Up/Down Bit Set

Level-2 IPv4 Forwarding Table

-----------------------------

IPv4 Destination IntCost ExtCost ExitInterface NextHop Flags

-------------------------------------------------------------------------------

14.14.14.0/24 10 NULL vlan200 Direct D/L/-

44.44.44.44/32 10 NULL Loop0 Direct D/-/-

12.12.12.0/32 10 NULL

22.22.22.22/32 10 NULL

Flags: D-Direct, R-Added to Rib, L-Advertised in LSPs, U-Up/Down Bit Set

The output shows that the neighbor information and routing information on Switch A and Switch B have

not changed during the active/standby switchover on Switch S. The neighbors are unaware of the
switchover.

BFD for IS-IS configuration example

Network requirements

As shown in

Figure 46

, run IS-IS on Switch A, Switch B and Switch C so that can reach each other

at the network layer.

After the link over which Switch A and Switch B communicate through the Layer-2 switch fails, BFD
can quickly detect the failure and notify IS-IS of the failure. Switch A and Switch B then communicate

through Switch C.

Figure 46 Network diagram

Device Interface

IP address

Device

Interface

IP address

Switch A

Vlan-int10

10.1.0.102/24

Switch B

Vlan-int10 10.1.0.100/24

Vlan-int11

11.1.1.1/24

Vlan-int13

13.1.1.1/24

Loop0

121.1.1.1/32

Loop0

120.1.1.1/32

Switch C

Vlan-int11

11.1.1.2/24

Vlan-int13

13.1.1.2/24

Configuration procedure

1.

Configure IP addresses for interfaces. (Details not shown.)

Advertising
This manual is related to the following products: