Validating your installation – Grass Valley NV8500 Series v.3.5 User Manual
Page 149
Advertising

133
NV8500 Series
User’s Guide
Validating Your Installation
When your installation is complete, perform the following checks to make sure the router and
power supplies are operating properly:
Check that all 5 green power LEDs on the front of each PS8100 or PS8300 power supply module
are lit. If any or all LEDs are off:
•
Verify that the PS8100 or PS8300 power supply module is fully seated in its slot.
•
Test for +48 volts at each of the 5 test points at the front of the power supply module.
Advertising
This manual is related to the following products: