Yaskawa Ladder Works Programming Manual User Manual
Page 42

2.14 SPEND TIME Instruction (SPEND)
2-25
[Program Example]
The time elapsed from the time data in MW00100 to MW00103 to the time data in DW00000 to
DW00003 is stored to MW00100 - MW00105.
98 yrs 5 mos 11 days 15 hrs 4 min 47 sec – 98 yrs 4 mos 2 days 8 hrs 13 min 8 sec
(MW00100) (MW00101) (MW00102) (MW00103) (DW00000) (DW00101) (DW00102) (DW00103)
= 0 yrs 39 days 6 hrs 51 min 39 sec
(MW00100) (MW00101) (MW00102) (MW00103)
Time data
Before execution
After execution
MW00100 H0098 H0000
MW00101 H0511 H0039
MW00102 H1504 H0651
MW00103 H0047 H0039
MW00104 ––
MW00105 ––
3394299 (Decimal)
DW00000 H0098 H0098
DW00001 H0402 H0402
DW00002 H0813 H0813
DW00003 H0008 H0008
Notes: In the operation results, the year is counted as 365 days and a leap year is not taken into
consideration. Also, the number of months is not counted. It is counted in days.