ProSoft Technology MVI46-PDPMV1 User Manual

Page 148

Advertising
background image

Reference

MVI46-PDPMV1 ♦ SLC Platform

User Manual

PROFIBUS DPV1 Master

Page 148 of 160

ProSoft Technology, Inc.

March 25, 2011

 Note: The shielding of both cables is connected internally with the metal housing of the

connector.

9 Complete the Central Shielding Measures (below) and grounding operations

for the shielding before you connect the cable connector to the module.

10 Plug the PROFIBUS DP connector into the module and secure it with the

screws.

Bus Begin and Bus End
The PROFIBUS connector with termination is required at the beginning and the

end of the bus. These connectors emulate the line impedance.
It is recommended that at least one connector with diagnostics interface is used.
Wiring diagram for a PROFIBUS DP cable

Grounding and Shielding for Systems with Equipotential Bonding
Each cable shield should be galvanically grounded with the earth using FE/PE

grounding clamps immediately after the cable has been connected to the cabinet.
This example indicates the shielding connection from the PROFIBUS cable to the

FE/PE rail.

Note: An equalization current can flow across a shield connected at both ends because of
fluctuations in ground potential. To prevent this, it is imperative that there is potential equalization
between all the attached installation components and devices.

Advertising