HP 20-Feb User Manual

Page 46

Advertising
background image

44 Connecting and Powering on the Library

Chapter 1

7. For 8/80 and 10/100 Series Libraries:

Connect the power cords on the rack to a power outlet on each library

level.
For 2/20, 4/40, and 6/60 series libraries, skip to the next step.

8. Connect the power cord(s) from the library to a grounded power

receptacle, and power on the library. The power (standby) switch is

recessed and on the lowest level of the library.
After the power-up test is complete (after several minutes), you will see the

Home Screen on the library’s front panel. The Home Screen displays the

status of the drives and library.

9. From the front panel, configure the library for Fibre Channel. See

Configuring the Library for Fibre Channel

on page 102 for more

information.

10. Connect a category 5 ethernet cable from the remote management card to

an active network port (see

Using the Remote Management Card

on

page 96).

11. Power on the host.

Advertising