2 load balance – Primera Technology Fujitsu Tape Drive RX300 S2 User Manual

Page 155

Advertising
background image

155

PRIMERGY RX300 S2 User’s Guide

5

Operatio

ns
after O
S

In

st

al

lation

2

The installer starts up. Proceed the installation by following the window

instructions.

When the window below appears during the installation procedure, check [BASP] and click

[Next].

5.6.2 Load Balance

Once a Windows Server 2003 or Windows 2000 Server Team is created, virtual adapters (BASP Virtual

Adapter) will be created in the [Device Manager] and/or [Network and Dial-up Connections] of the

system. Do not disable or delete a virtual adapter from the [Device Manager] or [Network and Dial-up

Connections]. When deleting a virtual adapter, make sure to use BACS.

■ Load Balance Setup Procedure

1

Start up BACS. The procedure differs depending on the OS being used.

For Windows Server 2003

1. Click [Start]

→ [Control Panel] → [Broadcom Control Suite 2].

For Windows 2000 Server

1. Click [Start]

→ [Settings] → [Control Panel].

The [Control Panel] window appears.

2. Start up "Broadcom Control Suite 2".

Advertising