Primera Technology Fujitsu Tape Drive RX300 S2 User Manual

Page 86

Advertising
background image

86

Chapter 3 OS Installation Using ServerStart

8

When a confirmation message to restart appears, click [Restart].

The system restarts and installs high reliability tools.

Installation is performed automatically.

9

When a message on installation completion appears, press any key.

10

Restart the system.

Click [Start]

→ [Shutdown]. Select [Restart] and click [OK].

The system restarts.

11

When the system restarts, log on to the server using the Administrator account

for the local computer.

The tool for updating drivers starts up.

The server setup and OS installation have been completed.

Refer to "Chapter 5 Operations after OS Installation" ( pg.129) and perform necessary procedures

before starting server operations.

Advertising