Acer AB460 F1 User Manual

Page 162

Advertising
background image

3 Server Blades: Setup and Installation

142

Figure 3-98. Power Control

Click Server Power Control in the left Options Window (2) to display
the Power Control submenu as shown above.

(3): Power Control and Status: This submenu indicates the status and
the current power control settings of the host server (the remote
console). The status of the remote server are displayed as below:

Reset Server: Click on this radio button to reset the power control
settings for the remote server.

Power Off Server - Immediately: Click on this radio button to
immediately power off the remote server.

Power Off Server - Orderly Shutdown: Click on this radio button to
power off and shut down the remote server in an orderly manner.

Power On Server: Click on this radio button to power on the
remote server.

Power Cycle Server: Click on this radio button to power cycle the
remote server.

(4): Perform Action: After selecting a power setting from the list above,
click on this item to execute the command and perform the action.

1

2

3

4

Advertising