Model 7500 Instruction Manual

Teledyne Analytical Instruments

3.2 Installation of analyzer

There are two methods of installing the analyzer.

For detailed dimensions, see Chapter 9.3.

Note: The mounting method should be selected to meet the installation requirements since the top cover

must be detached from the gas analyzer for maintenance and check.

Mounting method

Conditions

Remarks

Slide rail

No maintenance space is

provided at the top.

These methods must be rigid enough to

withstand the mass (about 10 kg) of the

gas analyzer.

Guide rail

Maintenance space is provided

at the top

Recommended slide rail: 305A-20, Accuride International Inc.

3.3 Piping

Caution on piping

CAUTION

In piping, the following precautions should be observed.

Wrong piping may cause gas leakage.

If the leaking gas contains a toxic component, there is a risk of serious accident being

induced.

Also, if combustible gas is contained, there is a danger of explosion, fire or the like

occurring.

• Connect pipes correctly referring to the instruction manual.

• Exhaust should be led outdoors so that it will not remain in the locker and installation

room.

• Exhaust from the analyzer should be relieved in the atmospheric air in order that an

unnecessary pressure will not be applied to the analyzer. Otherwise, any pipe in the

analyzer may be disconnected to cause gas leakage.

• For piping, use a pipe and a pressure reducing valve to which oil and grease are not

adhering. If such a material is adhering, a fire or the like accident may be caused.