Maintenance, Teledyne analytical instruments, 1 daily check – Teledyne 7500 - Infrared gas analyzer - operating manual User Manual

Page 61: 2 daily check and maintenance procedures

Advertising
background image

61

Model 7500 Instruction Manual

Teledyne Analytical Instruments

7. MAINTENANCE

7.1 Daily check

(1) Zero calibration and span calibration

1. It is used for zero point adjustment. For calibration, refer to 6.9.1, Zero calibration.

2. After zero calibration, perform span calibration. For calibration, refer to 6.9.2, Span calibration.

3. Zero calibration and span calibration should be performed once a week, if required.

(2) Flow check

1. Sampling gas flow rate and purge gas flow rate should be as follows;

Sampling gas flow rate: 1.0 L / min ±0.5 L / min (stable)

Purge gas flow rate: About 1L / min

2. Maintenance and check should be carried out every day, if required.

7.2 Daily check and maintenance procedures

Table 7-1 Maintenance and check list

Parts to be checked Phenomena

Cause

Remedy

Every day

Recorder indication

Lower indication

1. Dust is mixed in

the sample cell

1. Clean sampling

cell and check for

sampling device,

especially gas filter

2. Air is sucked in

anywhere in the

sampling tube

2. Check for leak of

the sampling line

and repair if required

Check for purge gas

flow if purging the

sampling gas flow

instrument

Standard flow rate

is 1L / min. It is not

within the range of

the specified flow

rate of 0.5 to 1.5 L /

min.

Adjust the flow

rate with flow rater

needle valve

Replacement

of Monitor filter

(membrane filter)

Much clogged

Primary filter is

damaged

1. Replace primary

filter

2. Replace filter

(paper)

Every week Zero point of gas

analyzer

Out of zero point

Zero calibration

Span point of gas

analyzer

Out of the standard

point

Span calibration

Replacement

of monitor filter

(membrane filter)

Irrespective of

phenomena

Replace filter

(paper)

Every year

Gas analyzer

Irrespective of

phenomena

Overhaul

Advertising