Lull 1044C-54 Series II Service Manual User Manual

Page 245

Advertising
background image

Boom and Transfer

31200079

6-103

Fig. 6-111: Upper Chain – Middle (Forward) to Middle (Rear) Boom Sections

42. (Ref. Fig. 6-111) Secure upper chain to middle (rear) boom section as

follows:

a. Bring upper chain lying on top of inner boom section up and around

the upper chain roller assembly (Item 5) on the middle (forward)
boom section (Item 6).

b. Install jam nut (Item 2) on chain adjustment anchor (Item 1). Insert

threaded portion of chain adjustment anchor through opening in
bracket at top of middle (rear) boom section.

c. Secure chain anchor with lockwasher (Item 3) and nut (Item 4).

Torque nut to 374 ft-lbs.

Fig. 6-112: Securing Lower Chains – Middle (Rear) and Outer Boom Sections

43. (Ref. Fig. 6-112) Align notch in head of adjustment rod (Item 3) with

threaded hole in anchor base (Item 4) of middle (rear) (Item 5) and
outer boom (Item 6) sections. Secure adjustment rod with lockwasher
(Item 2) and capscrew (Item 1). Torque capscrews to 50 in-lbs.

#

Description

1

Chain Adjustment Anchor

2

Jam Nut

3

Lockwasher

#

Description

4

Nut

5

Upper Chain Roller Assembly

6

Middle (Forward) Boom Section

0

80

60

40

20

-20

J

1252

4

1

3

2

1

2

3

4

5

6

#

Description

1

Capscrew

2

Lockwasher

3

Adjustment Rod

#

Description

4

Anchor Base

5

Middle (Rear) Boom Section

6

Outer Boom Section

Advertising