Lull 1044C-54 Series II Service Manual User Manual

Page 270

Advertising
background image

Boom and Transfer

6-128

31200079

WARNING: To avoid personal and/or equipment damage, support the

transfer carriage assembly when lifting and reinstalling it back
on the machine. Make sure that the transfer carriage
assembly is supported until it is completely installed.

b. Install the transfer carriage (Item 5) to rear of the main frame using

the two (2) each transfer rollers (Item 12), roller bushings (Item 11),
spindles (Item 10), thrust washers (Item 9), spacer washers
(Item 8), and spindle nuts (Item 7). Torque spindle nuts to
3466 ft-lbs.

Note: The quantity of spacer washers used with each machine may vary.

c. Secure each spindle nut with two (2) setscrews (Item 6).

d. Install the two (2) slide blocks (Item 4) to the front of the transfer

carriage with four (4) each capscrews, (Item 3) lockwashers
(Item 2), and nuts (Item 1). Torque the nuts to 130 ft-lbs.

e. Install the boom as described elsewhere in this section.

f.

Install the rear carriage tilt cylinder (See page 6-26).

g. Install the boom hoist cylinder (See page 6-14).

4. Move transfer carriage backward until the threaded port of transfer

cylinder rod can be inserted in its mounting hole.

5. (Ref. Fig. 6-124) Install transfer cylinder rod nut and washer. Torque

cylinder rod nut to 1641 ft-lbs. Secure rod nut with two (2) setscrews.

6. (Ref. Fig. 6-128) Reconnect hydraulic hoses (Item 1) to the hydraulic

tube elbows. Torque the swivel nuts on the hoses 79–88 ft-lbs.

7. (Ref. Fig. 6-128) Install the hose cover (Item 2) on the transfer carriage

with four (4) each capscrews (Item 4) and lockwashers (Item 3).
Torque the capscrews to 75 in-lbs.

8. (Ref. Fig. 6-125) Install boom elevation proximity switch as follows:

a. Work the wiring harness along the hydraulic tubes on the transfer

carriage.

b. Reconnect connection wire to boom proximity switch and wiring

harness.

c. Secure wiring harness to hydraulic tubes with wire ties.

9. (Ref. Fig. 6-127) For models with a 4-section boom, install the boom

extension proximity switch as follows:

a. If necessary, install the proximity mounting plate (Item 7) with two

(2) each lockwashers (Item 9)

a

nd capscrews (Item 10). Torque the

capscrews to 276 in-lbs.

b. Work the wiring harness along the hydraulic tube s on the transfer

carriage and up to the top of the boom.

c. Connect the proximity switch connection wire (Item 6) to the

proximity switch (Item 8) and the wiring harness (Item 5).

Advertising