Rio installation – Rockwell Automation 1395 Multi-Comm Hardware/Software User Manual

Page 80

Advertising
background image

Chapter 4

Installation

4–5

RIO Installation

Connection to an Allen-Bradley RIO network requires two basic
procedures:
S The MCA board DIP switches must be configured for the desired setup.
S The physical wire connections to the board are made.

Switch settings for RIO rack size (switch U5 channel A, and U14
channel B):

Switch positions 6–8 set the rack size for the MCA board. The size
determines how much real time data can be transferred between the Drive
and PLC Controller. Refer to table 4–E for switch setting details.

Rack Size

1/2 low, not last

Table 4-E. Switch settings for RIO rack size (U5 and U14)

1/2 low, last

Switch Positions

0

0

1/2 hi

6

7

0

0

0

1

8

0

1

3/4 low, not last

3/4 low, last

3/4 hi

full rack

1

1

1

0

0

1

0

1

0

1

0

1

0

Switch settings for RIO redundant mode (switch U6):

Switch position 2 determines whether two channels configured for RIO
communication operate indendently or in the redundant configuration.
Refer to Table 4–F for details.

Redundant Mode

Non-redundant

Table 4-F. Link Protocol and Baud Rate Selection

Switch positions

Redundant

2

0

1

Advertising