Introduction

9

1.7

Instrument Commissioning

1. Plug power cord in to outlet to turn on indicator, the display shows in sequence:

- SU followed by the software code (e.g.: SU S );
- r followed by the software version (e.g.: r 1.04.01 );
- HU followed by the hardware code (e.g.: HU 104 );
- The serial number (e.g.:1005 15 );

2. Check that the display shows the weight and that when loading the load cells there is an increase in weight.
3. If there is not, check and verify the connections and correct positioning of the load cells.

If instrument has NOT been calibrated, complete Section 2.1 on page 12 before proceeding to next step

4.Reset to zero. See Section 2.1.3 on page 14.

5. Check the calibration with test weights and correct the indicated weight if necessary. See Section 2.1.5 on

page 15.

6. Set the desired analog output type and the full scale value.

- Analog Output Model see Section 2.5 on page 19.
- DeviceNet Model see Section 2.4 on page 18.
- Ethernet Model see Section 2.7 on page 21.
- Profibus Model see Section 2.6 on page 20.
- Modbus/TCP see Section 3.10 on page 46.

7. If you use serial communication, set the related parameters (see Section 2.9 on page 24).
8. If setpoints are used, set the required weight values and the relevant parameters (see Section 2.12 on page

30 and Section 2.10 on page 27).

1.7.1 If The Instrument Has Not Been Calibrated

Missing plant system identification tag, proceed with calibration:

1. If load cells data are unknown, follow the procedure in Section 2.1.5 on page 15.
2. Enter the rated data of load cells following the procedure given in Section 2.1.1 on page 13.