Installation and wiring – Toshiba Programmable Controller PROSEC T3 User Manual

Page 75

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

4. Installation and Wiring

4.7

I/O wiring

The following module layout is recommended for noise immunity.

Duct for

low-voltage

signals

Duct for

power signals

Power

caUes

I/O modules for

low-voltage system

I/O modules for

power system

DC input module

AC input module

Analog input module

DC output module

Analog ou^ut module

AC output module

Pulse input module

Relay output module

ASCII module

Data link module

(1) To improve the unit's resistance to signal interference, install

modules for low-voltage signals toward the left of the unit, and

modules for power signals toward the right. Also, separate the

wires of each,

(2> Allow at least

too

mm (4 in) clearance between the units and

between other control equipment to allow access for

maintenance and ventilation,

(3) When installing the unit near high-voltage or high-power

equipment, leave at least 200 mm (8 in) clearance, or shield the

unit with a steel plate.

User's manual - Hardware

67

Advertising