S.Maintenance and Checking

5.2

Periodical checking

items

Check the T3 based on the following points every six months.
Also perform checks when the operating environment is changed.

Item

Content of checking

Corrective measures

Power supply

Measure the voltage of the
power (at the terminal of the
module)

85 to 132/170 to 264 Vac

20.4 to 28.8 Vdc

Check that the terminal screw of

the module is not loose.

Check that the terminal screw of

the module is not loose.

Check that wiring cable is not
damaged.

Check that wiring cable is not
damaged.

Installation

condition

Check that the basic unit is
installed securely.

Not loose, no play

Check that the expansion unit is

installed securely.

Not loose, no play

Check that each module is
irrstalled securely.

Not loose, no play

Check that each expan^n

cable connector is not loose; and
the cable is not damaged.

Not loose, not damaged

Programmer

Check that the functions of the
programmer are norrrral.

Try executing simple operations.

Check that the connector and the
cable are not damaged.

Not damaged

I/O modules

Measure the vdtage of each of

the I/O modules at the terminal

block.

The voltage must be within the
spedtied range.

Check the LED of the input
status display.

The LED must light normally.

Check the LED of the output

status display.

The LED must light normally.

Check tiiat the I/O teminal block
is installed securely.

Not loose, no play

Check that the terminal screw is
not loose and the terminal has a
sufficient distance to the next
terminal.

Not loose, and not contacting the
next terminal

Check that the wiring cat^e is not
damaged.

Not darrraged

Environment

Check that the temperature,
humidity, vibration, dust, etc. are

within the specified range.

Must be within the general
specification range.

Program

Check that the content of the

PLC program and the master

program (e.g., saved on a floppy
disk) are the same.

Check that these programs are
identical by comparison.

Battery

Check whether the battery must
be replaced. (The installed date
is written on the rear of the CPU
battery cover.)

Replace the current bettery if

more than two years has elapsed.

Check that the connector of the
battery is inserted firmly.

Not loose

70

PROSEC T3