Echelon FT 3150 Smart Transceiver User Manual

Page 112

Advertising
background image

Chapter 4 - Hardware Design Considerations

106

FT 3120 / FT 3150 Smart Transceiver Data Book

Figure 4.9 Typical EN 61000-4-6 Test Set-up for Unshielded Twisted Pair (UTP)

For the EN 61000-4-6 tests, the EUT is placed on a 10cm high, non-conducting support on top of the metal ground
plane. If the chassis of the EUT is connected to earth ground in typical installations, it should be connected directly to
the metal ground plane during the EN 61000-4-6 tests via a short wire. If the EUT is left floating in normal use, there
should be no connection between the EUT and earth ground for the EN 61000-4-6 tests. The power connections for
the AE and EUT should be routed through suitable decoupling devices, such as the non-driven M3 CDNs shown in
the figure. During the network immunity tests, any I/O lines that come out of the AE or EUT should also pass through
a decoupling network. The objective of the BCI current clamp in the figure is to drive the large common-mode noise
signal into the network cable of the EUT. The M3 CDNs in the figure ensure that the power supply inputs to the AE
and EUT are not an RF return path for the purposes of the EN 61000-4-6 test. See the EN 61000-4-6 test standard and
related articles for more information about test setups and procedures.

Termination

EQUIPMENT

UNDER

TEST (EUT)

HP8656B

SIGNAL

GENERATOR

75W

POWER

AMP

GROUND PLANE

TEST

CONTROL

COMPUTER

FCC

CDN - M3

50

AUXILIARY

EQUIPMENT

(AE)

Dressler

Alpha 250 / 75W

-6dB

75W
PAD

EMCO

ATT 6 / 75

FCC

CDN - M3

EUT

POWER

AE

POWER

GPIB

50

FCC BCI - Fischer Custom Communications
Bulk Current Injection Probe P/N F-120-9A

FCC CDN M3 - Fischer Custom Communications
Coupling De-Coupling Network P/N FCC-801-M3-16A

UTP

FCC

BCI

Advertising
This manual is related to the following products: