Figure 8-13 – FUJITSU SPARC ENTERPRISE M5000 User Manual

Page 164

Advertising
background image

8-20

SPARC Enterprise M4000/M5000 Servers Service Manual • August 2009

FIGURE 8-13

Installing the DC-DC Converter (With a DC-DC Converter Retainer)

4. Place the metal bracket into position and tighten the three screws that hold the

metal bracket in place.

Reconnect the small cable before tightening the screws to the bracket.

5. Install the I/O unit cover.

6. Tighten the two screws at the front of the I/O unit using a No. 2 screwdriver.

.

Advertising