3 installing the xscf unit, 4 securing the server, Installing the xscf unit – FUJITSU SPARC ENTERPRISE M5000 User Manual

Page 175: Securing the server

Advertising
background image

Chapter 9

XSCF Unit Replacement

9-5

9.1.3

Installing the XSCF Unit

Caution –

Do not force the XSCF unit into a slot. Doing so can cause damage to the

XSCF unit and server.

1. Place the XSCF unit on the lip and gently slide it into the slot.

Use the lever as a handle to avoid touching the circuits.

2. Lock the lever into place to seat the board.

3. Connect the ethernet and UPC cables to the XSCFU.

9.1.4

Securing the Server

1. Power on the server.

This step includes reconnecting power cables, verifying the state of the LEDs,
and turning the keyswitch to the Locked position. See

“Powering the Server On

Using Software” on page 4-13

.

Note –

If automatic booting is configured, use the sendbreak -d domain_id

command after the display console banner is displayed but before the system starts
booting the operating system to get the ok prompt.

2. Confirm the hardware.

This step includes running programs to be certain all components are mounted
again and then booting the operating system.

Refer to

“Verifying Hardware Operation” on page 4-9

for more information.

Note –

The version of the firmware on the replaced XSCF unit might be different

from the version on the original. When replacing the XSCF unit, the operator will be
presented with installation options on firmware. To check the version and update
the firmware, refer to the SPARC Enterprise M3000/M4000/M5000/M8000/M9000
Servers XSCF User’s Guide
.

3. Reset the clock.

See the SPARC Enterprise M3000/M4000/M5000/M8000/M9000 Servers XSCF User’s
Guide
for more detailed information on setting the system clock.

Advertising