FUJITSU SPARC ENTERPRISE M5000 User Manual

Page 223

Advertising
background image

Chapter 12

CPU Module Replacement 12-13

13. Continue with the appropriate installation procedure:

If you are adding a new SPARC64 VII–equipped CPU module to a domain
configured with SPARC64 VI processors, continue with

“Adding a SPARC64 VII

CPU Module to a Domain Configured With SPARC64 VI” on page 13

.

If you are upgrading an existing SPARC64 VI CPU module in an existing domain
to SPARC64 VII processors, continue with

“Upgrading a SPARC64 VI CPU

Module to SPARC64 VII on an Existing Domain” on page 15

.

▼ Adding a SPARC64 VII CPU Module to a

Domain Configured With SPARC64 VI

This procedure must be preceded by

“Preparing to Add SPARC64 VII Processors to

an Existing Domain” on page 11

. If you have not completed that procedure, do so

before continuing.

1. Install the CPUM in the server.

For instructions, refer to the “CPU Module Replacement,” chapter in the Sun
SPARC Enterprise M4000/M5000 Servers Service Manual
. Note that this procedure
involves powering down the entire server.

Caution –

After installing the CPU module, you must reconnect the power cable to

the power supply.

2. Log in to the XSCF again, using an account with platadm or fieldeng

privileges.

Perform an initial diagnosis of the newly installed CPU module.

The following example shows a test after adding PSB#01:

XSCF> testsb 01

XSCF> testsb 01

Initial diagnosis is about to start. Continue? [y|n] : y

Initial diagnosis is executing.

Initial diagnosis has completed.

XSB Test Fault

---- ------- --------

01 Passed Normal

Advertising