Sanyo C4272R S/C User Manual

Page 33

Advertising
background image

33

X

(d) Installing the ceiling panel

Attach the ceiling panel to the chamber. Drawing the

panel downwards sets the panel in position temporarily

with the panel catch (at 2 locations).

Remove the socket cover of the air-intake plenum and

pass the 8P sockets through it. (Fix the panel lead wire

with the chamber side clamp.) (Fig. 3-17)

Connect the 8P socket (electrical component box side)

to the 8P socket (ceiling panel side) of the indoor unit

electrical component box.

Reattach the socket cover.

Ceiling panel

Panel catch

Installation screws

(M4

× 1/2 in.)

Duct
connection
flange

Duct connection box

Fig. 3-18

07-115 SSHP_II 5/7/07 3:59 PM Page 33

Advertising
This manual is related to the following products: