3. Electrical Installation
18
PNEG-1895 V2 Electronic Distributor Control
Power Supply Wiring to Control Panel Electrical Connections
NOTE: Ensure the power supply voltage source is OFF before installation.
Install power supply cable through the control panel using suitable hardware as shown in
.
Connect the power supply hot wires (B) to the control panel circuit breakers (C) as shown in
Connect the power supply ground wire (D) as shown in
to the ground terminal block as shown
in
.
Figure 3J Control Panel Wiring from Motor Electrical Connections
Ref #
Description
A
Power Cable Hardware
B
Hot Wires
C
Control Panel Circuit Breakers
D
Power Supply Ground Wire
A
B
C
D