Parts list, Chapter 5 parts list – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1895 User Manual

Page 38

Advertising
background image

38

PNEG-1895 V2 Electronic Distributor Control

5. Parts List

12" 6 Hole 45° Distributor Assembly Electronic Control
(DFB12645G-EC)

Assembly Procedure:

1. Install shaft (DEC0009) with provided roll

pins (S-9288).

2. Install enclosure (DEC0005) with 3/8" bolts and

nylock nuts.

3. Install junction box (DEC0105) with self-drilling

screws.

4. Install sensor mounting angle (DEC0014) and

plate (DEC0006).

5. Install sensors (DEC0107) and set clearance.

(See detail A.)

6. Install encoder (DEC0106), torque set screw to

8 in-lbs.

7. Install motor (DEC0015) and mount brackets

(DEC0003 and DEC0021).

8. Install bottom (DEC0021) and side (DEC0013)

covers.

NOTE: Install sensors in #3 hole on both sides.

Set 0.050" ± 0.01" clearance from face of each
sensor to flag on shaft.

See detail A

Detail A

Advertising