Main screen, Bin 1 – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1895 User Manual

Page 21

Advertising
background image

4. Operation Procedures

PNEG-1895 V2 Electronic Distributor Control

21

Main Screen

Depending on the number of spouts in the current configuration, one of the following screens will be
displayed.

(See Figure 4C,

Figure 4D,

Figure 4E

and Figure 4F.)

The display depicts a view of your

distributor as it would appear if looking down from above, with lower spout numbers to the left and higher
spout numbers to the right. The name of the current spout is indicated at the top of the screen and is
indicated in the graphic with a green circle. At the bottom of the screen are three (3) buttons to navigate
to either the Help Menu, Move Position Screen or Setup Menu.

Figure 4C Four (4) Spout Main Screen

Figure 4D Six (6) Spout Main Screen

Figure 4E Eight (8) Spout Main Screen

Figure 4F Ten (10) Spout Main Screen

CURRENT SPOUT SELECTION:

BIN 1

CURRENT SPOUT SELECTION:

BIN 1

CURRENT SPOUT SELECTION:

BIN 1

CURRENT SPOUT SELECTION:

BIN 1

Advertising