Retrofit installation, Chapter 6 retrofit installation, Electronic distributor control shaft installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1895 User Manual
Page 40
Advertising
40
PNEG-1895 V2 Electronic Distributor Control
6. Retrofit Installation
Electronic Distributor Control Shaft Installation
Install the shaft (DEC0009) (A) to the distributor shaft (D) using two (2) roll pins (S-9288) (B). NOTE: Flag
extension (C) should be installed in line with the spout to ensure proper alignment with the sensor.
Figure 6A Electronic Distributor Control Shaft
Ref #
Part #
Description
A
DEC0009
Shaft
B
S-9288
Roll Pin
C
Flag Extension
D
Distributor Shaft
E
Spout
Advertising