6. Retrofit Installation
PNEG-1895 V2 Electronic Distributor Control
49
Installing the Connector Box and Cables
1. Install the connector box to the inside of the enclosure using four (4) bolts (B) and nuts (C).
Make sure nuts are located on the outside of the enclosure.
Figure 6J
2. Pull sensor cable through the conduit connected to the enclosure.
3. Connect cables to the connector enclosure.
Figure 6K Control Panel Wiring to Junction Box Electrical Connections
Ref #
Part #
Description
Ref #
Part #
Description
A
Enclosure
E
DEC0105
Connection Enclosure
B
Bolts
F
DEC0106
Encoder
C
Nuts
G
DEC0109
Over-Travel Proximity Sensor Cable
D
DEC0108
Home Proximity Sensor Cable
H
DEC0026-XXX
Sensor Cable
NOTE: “XXX” represent the length of the cable.
E
D
G
H
F