6. Retrofit Installation

PNEG-1895 V2 Electronic Distributor Control

49

Installing the Connector Box and Cables

1. Install the connector box to the inside of the enclosure using four (4) bolts (B) and nuts (C).

Make sure nuts are located on the outside of the enclosure.

(See Figure 6J.)

Figure 6J

2. Pull sensor cable through the conduit connected to the enclosure.

3. Connect cables to the connector enclosure.

(See Figure 6K.)

Figure 6K Control Panel Wiring to Junction Box Electrical Connections

Ref #

Part #

Description

Ref #

Part #

Description

A

Enclosure

E

DEC0105

Connection Enclosure

B

Bolts

F

DEC0106

Encoder

C

Nuts

G

DEC0109

Over-Travel Proximity Sensor Cable

D

DEC0108

Home Proximity Sensor Cable

H

DEC0026-XXX

Sensor Cable

NOTE: “XXX” represent the length of the cable.

E

D

G

H

F

Advertising