Control motor installation, Retrofit installation – Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1895 User Manual

Page 51

Advertising
background image

6. Retrofit Installation

PNEG-1895 V2 Electronic Distributor Control

51

Control Motor Installation

Install the motor (DEC0015) (A) to the motor mounting bracket (DEC0003) (F) using two (2) 1/4"-20 x 1"
HHCS bolts (S-6998), four (4) 1/4" washers (S-2126) (D) and two (2) 1/4"-20 nylock nuts (S-7025) (C) as
shown in

Figure 6M

.

Install second motor mounting bracket (DEC0021) (B) to the enclosure (DEC0005) using two (2)
1/4"-20 x 3/4" HHCS bolts (S-1429) (E), 1/4" washers (S-2126) (D) and 1/4"-20 nylock nuts (S-7025) (C).
Then install the motor to the motor mounting bracket (DEC0021) (B) using two (2) 1/4"-20 x 1" HHCS
bolts (S-6998), four (4) 1/4" washers (S-2126) (D) and two (2) 1/4"-20 nylock nuts (S-7025) (C) as shown
in

Figure 6M

.

Figure 6M Control Motor Installation

Ref #

Part #

Description

A

DEC0015

Motor

B

DEC0021

Motor Mounting Bracket - Short

C

S-7025

1/4"-20 Nylock Nut

D

S-2126

1/4" Washers

E

S-1429

1/4"-20 x 1" HHCS Bolt

F

DEC0003

Motor Mounting Bracket

G

DEC0011

Key