Maintenance, Cleaning the flow tube and electrode, Replacing the fuse – Badger Meter M-Series M2000 User Manual

Page 55: Replacing the circuit board

Advertising
background image

MAINTENANCE

Mandatory, routine or scheduled maintenance should not be required for the M2000 Mag Meter electronics or flow tube after

proper installation
However, some instances may require personnel to perform the following:

Flow tube and electrode cleaning

Fuse replacement

Circuit board replacement

Disconnect main power to the unit before attempting any device maintenance or cleaning

Do not clean components inside the amplifier or junction box

Cleaning the Flow Tube and Electrode

At times flow tube, electrodes, amplifier/junction box housings and the amplifier window may need periodic cleaning,

depending on process fluid properties, fluid flow rate and surrounding environment
Clean the flow tube and electrodes by following the material handling and cleaning procedures documented in Material

Safety Data Sheet (MSDS) guidelines for the product(s) that were in contact with the flow tube and electrodes
Should flow tube and/or electrode cleaning become necessary:

1 Disconnect detector from pipeline
2 Clean electrodes according to MSDS guidelines
3 Reconnect detector to pipeline

Replacing the Fuse

Disconnect main power to the unit before attempting any device maintenance Risk of electrical shock Replace the fuse only

with 250V AC, 2 amp, slow blow (5 x 20 mm)
Authorized personnel must replace fuses

Replacing the Circuit Board

Refer to the M-Series M2000 Interchangeability Procedure Application Brief for information on replacing circuit boards

Installation & Operation Manual

Page 55

August 2012

Advertising