Displaying the task function, Displaying the task percent done – HP NetRAID-4M Controller User Manual

Page 291

Advertising
background image

13-3

Working with Tasks

TaskId Function Done% Container State Specific1 Specific2

------ -------- ------- --------- ----- --------- ---------

103 Create 63.5% 00 RUN 00000000 00000000

Displaying the Task Function

The

task function

attribute indicates the type of task running on

the controller. See the Command Line Interface Reference Guide for a
description of task types. To display the task function of a task
running a controller, use the

task list

command, as in the

following example. In the example, the Function column indicates
that Create is the task function for task 103.

HPN0> task list

Executing: task list

Controller Tasks

TaskId Function Done% Container State Specific1 Specific2

------ -------- ------- --------- ----- --------- ---------

103 Create 63.5% 00 RUN 00000000 00000000

Displaying the Task Percent Done

The

task percent done

attribute indicates the progress

(percentage complete) of a running task. A running task is complete
when the percentage done is 100%. To display the percentage done
for a running task, use the

task list

command, as in the

following example. In the example, the Done% column indicates
63.5%

, which means that the percentage done is 63.5% for task 103.

HPN0> task list

Executing: task list

Controller Tasks

TaskId Function Done% Container State Specific1 Specific2

------ -------- ------- --------- ----- --------- ---------

103 Create 63.5% 00 RUN 00000000 00000000

Advertising