NOTE: Install the wheels so that both center and outer

treads face the same direction.

g . Install the twenty cap screws (6), washers and nuts
through the wheel rims . Torque the nuts to
70 N·m (525 ft-lbs) .

NOTE: The drums on the center and outer wheels have

large cutouts in them to assist in installing the drum

hardware.

h . Repeat the above procedure for the other three
sets of triple wheels .

i . Drive the tractor, steering from lock to lock . Park
the tractor and recheck the torques on the inner and
outer wheel nuts as detailed in Steps e and g .