SECTION 4 - BOOM & PLATFORM

3121180

– JLG Lift –

4-23

Installing Counterbalance Valve

Refer to Figure 4-9., Rotator Counterbalance Valve.

1. Clean actuator surface of any contamination and for-

eign debris including old Loctite.

2. Make sure new valve has O-rings in counterbores of

valve to seal it to actuator housing.

3. Bolts that come with valve are grade 8 bolts. Install

new bolts with a new valve. Apply Loctite #242 to
the shank of three bolts during installation.

4. Torque 1/4" bolts 110 to 120 in-lb (12.4 to 13.5 Nm).

Do not torque over 125 in-lb (14.1 Nm). Torque 5/16"
bolts 140 in-lb (15.8 Nm). Do not torque over 145 in-lb
(16.3 Nm).

Figure 4-9. Rotator Counterbalance Valve