JLG 450A_AJ Series II Service Manual User Manual
Page 83
Advertising
SECTION 3 - CHASSIS & TURNTABLE
3121180
– JLG Lift –
3-33
7. Following cluster gear, place one more thrust
washer (3B) onto planet shaft (3E) through opposite
planet shaft hole in carrier housing (3A).
8. Use an alignment punch or similar tool to align roll pin
holes in carrier housing (3A) and planet shaft (3E).
9. Drive roll pin (3G) into aligned roll pin holes in carrier
housing (3A) and planet shaft (3E).
10. Repeat steps 1 thru 9 to assemble and install two
remaining cluster gears.
11. At this point carrier sub-assembly is complete.
Advertising