JLG 450A_AJ Series II Service Manual User Manual

Page 83

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121180

– JLG Lift –

3-33

7. Following cluster gear, place one more thrust

washer (3B) onto planet shaft (3E) through opposite
planet shaft hole in carrier housing (3A).

8. Use an alignment punch or similar tool to align roll pin

holes in carrier housing (3A) and planet shaft (3E).

9. Drive roll pin (3G) into aligned roll pin holes in carrier

housing (3A) and planet shaft (3E).

10. Repeat steps 1 thru 9 to assemble and install two

remaining cluster gears.

11. At this point carrier sub-assembly is complete.

Advertising