Main assembly, Main assembly -18, Main assembly drawing1 -18 – JLG 450A_AJ Series II Service Manual User Manual

Page 68

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-18

– JLG Lift –

3121180

Main Assembly

NOTE: All components should receive a generous amount

of lubricant oil as they are being assembled.

1. Place Housing-Spindle Sub-Assembly on table with

Spindle (1A) side down.

2. Place Output Carrier Sub-Assembly into Housing

(1E) and onto Spindle (1A).

3. Insert larger diameter splined end of Input Shaft (7)

through bore of Output Carrier Sub Assembly (4A) until
shoulder of Input Shaft (7) contacts Thrust Washer (4J)
(See assembly drawing at back of manual).

4. With modified spline end facing up, place Output

Sun Gear (8) into mesh with planet gears from Out-
put Carrier Sub-Assembly (4A).

5. Place Input Carrier Sub-Assembly (3A) onto Output

Sun Gear (8) splines.

6. Grease O-Ring (19) and insert into groove in Cover

Sub-Assembly (6).

7. Install Cover Sub-Assembly (6) onto Housing (1E)

and install twelve Bolts (14) into Cover (6). Torque
bolts to 70-80 in-lbs.

8. Attach ID Tag (15) onto unit. If Cover has knobs as

part of cover, peen top of each knob to form a head
to hold on Tag. If no knobs, use drive screws.

9. Check disconnect, roll and leak check unit, leak

check brake, and check brake release pressure.

Figure 3-10. Main Assembly Drawing1

7. Input Shaft
8. Output Sun Gear
17. Input Sun Gear

Advertising