Resistance measurement, Continuity measurement, Resistance measurement -2 – JLG 450A_AJ Series II Service Manual User Manual

Page 418: Continuity measurement -2

Advertising
background image

SECTION 7 - BASIC ELECTRICAL INFORMATION & SCHEMATICS

7-2

– JLG Lift –

3121180

Resistance Measurement

• Test meter and leads by touching leads together.

Resistance should read a short circuit (very low
resistance).

• Circuit power must be OFF before testing resistance.
• Disconnect component from circuit before testing.
• If meter is not auto ranging, set it to correct range

(See multimeter’s operation manual).

• Use firm contact with meter leads.

Continuity Measurement

• Some meters require a separate button press to

enable audible continuity testing.

• Circuit power must be OFF before testing continuity.
• Disconnect component from circuit before testing.
• Use firm contact with meter leads.
• First test meter and leads by touching leads

together. Meter should produce an audible alarm,
indicating continuity.

Figure 7-2. Resistance Measurement

Figure 7-3. Continuity Measurement

Advertising