Commissioning
Before switching on
7
Feldbus-Baugruppe 2113 INTERBUS
7.5
7.5.1
L
7.5-1
EDSIBS-1.0-06/2003
7.5
Commissioning
7.5.1
Before switching on
(
(
(
(
Stop!
Before switching on the mains voltage, check the wiring for
completeness, earth fault and short circuit.
)
)
)
)
Note!
Do not change the switch-on sequence!