Commissioning
Before switching on

7

Feldbus-Baugruppe 2113 INTERBUS

7.5

7.5.1

L

7.5-1

EDSIBS-1.0-06/2003

7.5

Commissioning

7.5.1

Before switching on

(

(

(

(

Stop!

Before switching on the mains voltage, check the wiring for
completeness, earth fault and short circuit.

)

)

)

)

Note!

Do not change the switch-on sequence!