Commissioning
Ensure that the settings match the 2111 fieldbus module

7

Feldbus-Baugruppe 2113 INTERBUS

7.5

7.5.4

L

7.5-5

EDSIBS-1.0-06/2003

7.5.4

Ensure that the settings match the 2111 fieldbus module

OPEN

1 2 3 4 5 6 7 8

Length

PD PCP

Length Drivecom

Baud

ON

OFF

2113IBU005

S1 ... S8

Explanation

OFF
(Lenze setting)

The response is the same as of the Lenze fieldbus module “2111 INTERBUS”, if the
Lenze setting for the switches (S1 - S7 = OFF) and codes L-C1910 = 4, L-C1911 = 1 and

L-C1912 = 1 remain unchanged.

7.5.5

Commissioning of 2113 fieldbus module

1. The fieldbus module must be attached to the controller

(

¶ 7.4-2)

.

2. The controller and if available the separate voltage supply for the 2113

fieldbus module must be switched on.

3. Check fieldbus module signals:

– The green bus LED indicates the operating status according to the

corresponding description

(

¶ 7.4-1)

Pos.

0.

– The yellow bus LED indicates the communication status according to the

description

(

¶ 7.4-1)

Pos.

1.

– Quick blinking (8 Hz) is the reaction of the yellow bus LED to

impermissible settings. Please see chapter 7.7, ” Troubleshooting and fault
elimination” .

4. You can now communicate with the drive.

– With a PCP communication it is only possible to access the parameters of

the controller after having executed the PCP service ” Initiate“

(

¶ 7.6-50)

.

5. It is then possible to access the parameters via the PCP services ” Read“

and ” Write“

(

¶ 7.6-50)

.