3 first switch-on, First switch-on – Lenze EMF2179IB User Manual
Page 53
![background image](/manuals/565928/53/background.png)
EMF2179IB communication module (DeviceNet)
Commissioning
First switch-on
5
5.5
5.5.3
5.5-6
EDSDEN EN 02/2006
5.5.3
First switch-on
Note!
Follow the commissioning steps in the given order!
1. Switch on the basic device and the external supply of the
communication module.
– The status message display of the controller (”Drive-LED”) must light
up green or be blinking.
– The LED ”Connection status to basic device” must light up green.
– The LED ”Connection status to bus” must be blinking green.
2. Use the configuration software (e.g. RSNetWorx) to integrate the
communication module into the DeviceNet.
– When the communication module has been configured, the status of
the LED ”Connection status to bus” changes from “blinking” to “on”.
3. It is now possible to communicate with the drive, i.e.
– Via “explicit messages” you can read and write all parameters from
the drive and/or communication module.
– You can read actual values (e.g. status words) or write setpoints
(e.g. frequency setpoints).