Chapter, Chapter chapter 3 3 3 3, Install the aadvance system – Rockwell Automation AADvance Controller System Build User Manual

Page 45

Advertising
background image


Document: 553632
(ICSTT-RM448_EN_P) Issue: 08:

3-1

The system installation defines the steps that will ensure the system is correctly
installed and ready for the on-site factory tests before the system is brought on-line.
This chapter describes how to install the AADvance system hardware into the chosen
enclosure.

In This Chapter

In This Chapter

In This Chapter

In This Chapter

Unpacking and Pre-assembly Checks ............................................................. 3-1
Install Base Units and termination Assemblies: Enclosure DIN Rail
Assembly Method ............................................................................................... 3-2
Install Base Units and Termination Assemblies: Flat Panel Assembly .... 3-4
Connect the AC Safety Ground Connection .............................................. 3-7
Connect the 24V dc System Power to an AADvance Controller .......... 3-7
Power and External Connector Wiring Details .......................................... 3-9
Procedure to Connect Serial Communications Cabling ......................... 3-10
System Security ................................................................................................. 3-12
Connecting Field Wiring ................................................................................. 3-13
Connecting the AADvance Controller to an Ethernet Network ......... 3-23
Install Modules ................................................................................................... 3-24
Install a T9110 Processor Module ................................................................ 3-24
Install I/O Modules ........................................................................................... 3-27
Install Blanking Covers .................................................................................... 3-28
Fit EMC Static Protection Covers ................................................................ 3-28
Install T9310 Expansion Cable ....................................................................... 3-29
Fault Reporting Reference Information ....................................................... 3-32
Status Indicators on the T9110 Processor Module .................................. 3-33

Unpacking and Pre

Unpacking and Pre

Unpacking and Pre

Unpacking and Pre----assembly Checks

assembly Checks

assembly Checks

assembly Checks

The components are packed to make sure they arrive undamaged and ready for
assembly. Nevertheless, you should inspect all modules before beginning the assembly
work.

On receipt, carefully inspect all the shipping cartons for damage.

If any cartons are damaged, note the damage on the carrier's shipping document
before signing it. Save any damaged cartons for inspection by the carrier.

If any part of the delivered components has been damaged during shipping, notify
the carrier and Rockwell Automation immediately.

Damaged goods must be returned Rockwell Automation for repair or replacement
(see Warranty and Returns instructions with delivery documentation).


Chapter

Chapter

Chapter

Chapter 3

3

3

3

Install the AADvance System

Install the AADvance System

Install the AADvance System

Install the AADvance System