Rockwell Automation AADvance Controller System Build User Manual

Page 74

Advertising
background image

3-30

Document: 553632

(ICSTT-RM448_EN_P) Issue: 08:

System Build Manual (AADvance Controller)


Secure the socket assembly by inserting the two M3 socket cap screws.

Tighten the screws with a 2.5mm Allen key.

Install the cable to the socket assembly and tighten the retaining screws by
hand.

2)

Insert the free end of the expansion cable into a right hand socket of a T9300 I/O

base unit.

Insert a cable plug assembly into into the right hand socket of the processor or
I/O base unit.

Secure the plug assembly by inserting the two M3 socket cap screws.

Tighten the screws with a 2.5mm Allen key.

Install the cable to the plug assembly and tighten the retaining screws by hand.

Connect Between a T9300 I/O

Connect Between a T9300 I/O

Connect Between a T9300 I/O

Connect Between a T9300 I/O Base Unit and a T9300 I/O Base Unit

Base Unit and a T9300 I/O Base Unit

Base Unit and a T9300 I/O Base Unit

Base Unit and a T9300 I/O Base Unit

1)

Connect the expansion cable between a T9100 processor base unit (or a T9300

I/O Base unit) to a T9300 I/O base unit.

Insert a cable plug assembly into into the right hand socket of the processor or
I/O base unit.

Secure the plug assembly by inserting the two M3 socket cap screws.

Advertising