Rockwell Automation AADvance Controller System Build User Manual

Page 73

Advertising
background image


Document: 553632
(ICSTT-RM448_EN_P) Issue: 08:

3-29

Install T9310 Expansion Cable

Install T9310 Expansion Cable

Install T9310 Expansion Cable

Install T9310 Expansion Cable

1)

The expansion cable ferrites are snap on components. Fit the ferrites 50mm (1.97)

from each end and secure with cable ties either side of the ferrites.

Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)

Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)

Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)

Connect Expansion Cable between T9100 Base Unit and T9300 I/O Base unit (IO Bus2)

1)

Connect the expansion cable to a T9100 processor base unit for an IO Bus 2

connection.

Insert a cable socket assembly into the left hand connector of the T9100
processor base unit.

Advertising