Ultra-cut 400, Connect input power and system ground cables – Tweco 400 Ultra-Cut(March 2013) User Manual

Page 33

Advertising
background image

Manual No. 0-5163

3-7 INSTALLATION

ULTRA-CUT 400

Connect Input Power and System Ground Cables

1. Carefully cut back the outer sheath on the primary input power cable to expose the individual wires. Cut back

the insulation on the individual wires. Route the cable upward through leads bracket at the bottom of the rear

panel, then through the connections cover support panel on the rear panel of the power supply.

NOTE

For CE versions the cable will need to be routed through the EMC filter box first. See following illustration.

2. Install stripped end of 3 phase wires into the terminal block L1, L2 and L3.

3. Connect the individual cables as shown. Connect the power cable ground cord to the ground terminal block.

CAUTION

The clear connections cover must remain in place.

4. If required pass a system ground cable (F1) through the last opening in the connections cover support panel

next to the input power cable. Connect the cable to the ground terminal block on the power supply rear panel.

Refer to the Ground Connections Section for full details and procedures on proper system grounding.

PILOT

WORK

TO

RCH

Input power cable

Ground Terminal Block

Connections Cover
Support Panel

System Ground Cable

Art # A-09834

to Remote Arc Starter

Connections Cover

Connection Panel

Leads Bracket

to Remote Arc Starter

AC INPUT

System Ground Cable

Input power cable ground

L1 L2

L3

L1

L2

L3

Input power cable

EMC Filter

CE units ONLY

Advertising