Ultra-cut 400, 02 start-up sequence, Power – Tweco 400 Ultra-Cut(March 2013) User Manual

Page 78: On off o i

Advertising
background image

OPERATION

4-2

Manual No. 0-5163

ULTRA-CUT 400

4.02 Start-Up Sequence

1. Connect system to primary input power.

2. Turn ON/OFF switch to ON (up) position. AC Indicator

turns ON after about 5 seconds.

POWER

ON

OFF

O

I

OFF

O

Art # A-04812

3. Check the AC indicator. If the inverter modules are correctly configured for the input voltage and the switch is

ON, then voltage has been applied to the inverter modules (input contactors are ON). If the indicator does not
light after a few seconds disconnect power and check that each inverter is correctly configured for the input
voltage and all 3 phases are present. Check Status Indicator for any codes that can help. Once it is determined
that input is OK, it is necessary to select and load a process.

4.03 TSC-3000 Navigation Functions

SAMPLE

SAMPLE

System Status: IDLE

-

+

DISPLAYS SYSTEM STATUS IN ALL SCREENS

BACK BUTTON

:

REVERSES TO THE PREVIOUS PAGE

INCREMENTS

/

DECREMENTS THE

SELECTED VALUE

OK /NEXT BUTTON

:

ACCEPTS ENTRIES AND MOVES TO THE

NEXT PAGE

PAGE HEADER

SELECTION NAVIGATION

:

MOVES CURSOR/SELECTION UP

AND DOWN ON THE PAGE OR

SCROLLS TEXT IN DIALOG BOX

WINDOW

Art # A-09158

Advertising